#Metaโ€™s #BeaverDam #DataCenter needs ๐Ÿฎ๐Ÿฎ๐Ÿฌ ๐—บ๐—ฒ๐—ด๐—ฎ๐˜„๐—ฎ๐˜๐˜๐˜€ โ€” basically two large power plants โ€” and the process came wrapped in ๐—ฟ๐—ฒ๐—ฑ๐—ฎ๐—ฐ๐˜๐—ถ๐—ผ๐—ป๐˜€, ๐—ก๐——๐—”๐˜€, and ๐—ฐ๐—ผ๐—ฟ๐—ฝ๐—ผ๐—ฟ๐—ฎ๐˜๐—ฒ ๐—ต๐—ถ๐—ฑ๐—ฒ-๐—ฎ๐—ป๐—ฑ-๐˜€๐—ฒ๐—ฒ๐—ธ. But sure, tell us again how this is โ€œgrowth.โ€๐Ÿ˜ค

Wisconsin regulators approve r...
Wisconsin regulators approve rates for Meta's Beaver Dam data center, with sharp criticism

Wisconsin utility regulators blasted Alliant Energy and Meta Thursday for a lack of transparency as they approved changes to custom electric rates for the tech companyโ€™s plans to build a $1 billion data center campus in Beaver Dam.

WPR

Highway 60 through Algonquin Park has a lot of trails, designed to show off different aspects of the park's habitat. This was along the Beaver Pond Trail.

Nothing here to give a sense of scale, but this is a really impressive dam, maybe 5 feet?

#BeaverDam #AlgonquinPark #JPegsFolder

Here's a picture from a few days ago (not mine, used by permission). I'll have to find some relatively recent pictures I took before the dam was destroyed.

2/

#Polesia #wetlands #beavers #beaverdam #drought

BBC Films Yellowstone Beaver Felling Trees and Making a Dam for Winter

Beavers can take out a tree in just a few hours.

PetaPixel
#protest in #beaverdam today at noon. Meet between chamber of commerce and historical society. Shoe solidarity with Minnesota to push #iceout.

Beavers were brought to the desert to save a dying river. Six years later, here are the results.

https://fed.brid.gy/r/https://www.upworthy.com/beavers-refresh-utah-desert-ex1

Wake up Wisconsin! Judging by what Port Washington's Mayor had to say about their Data Center Project, I'm sure Beaver Dam's residents won't be actively listened to either.

https://www.wpr.org/news/meta-beaver-dam-data-center-campus

#Wisconsin #dataCenters #energy #lakes #water #ai #FolkifiedPoprageousness #BeaverDam #Meta

Meta to invest more than $1B on Beaver Dam data center campus

Social media giant Meta plans to invest more than $1 billion to build a 700,000-square-foot data center campus in Beaver Dam, bringing with it more than 1,000 construction jobs and 100 operational jobs when the campus is completed.

WPR