This is how stupid a battery powered bus looks to an engineer.
This is how stupid a battery powered bus looks to an engineer.
This is very revealing. The OP on Instagram (TheTransitGuy) attributes this to a lack of in-house capacity here in North America. I would add that the costly line items shown within soft costs are likely the main causes of the outrageously long timelines for Metrolinx projects.
#StolenFromInstagram #TheTransitGuy
#toronto #ontario
#transit
#TransitFail