Please build the northern extension of the K-Line as soon as possible.
-
Por favor, construyan la ampliación norte de la K-Linea lo antes posible.
Please build the northern extension of the K-Line as soon as possible.
-
Por favor, construyan la ampliación norte de la K-Linea lo antes posible.
Metrolink to be extended to Santa Barbara once per day later this year.
#transit #socaltransit #Metrolink #LosAngeles
La Verne Pedestrian Bridge Will Connect Metro A Line, Metrolink, and Fairplex.
This is great for the San Gabriel Valley.
#transit #metrolink #metrolosangeles #losangeles #socaltransit #rail #sangabrielvalley
How high-speed rail will get from Los Angeles to Anaheim.
https://la.urbanize.city/post/how-california-high-speed-rail-would-reach-anaheim
#hsr #highspeedrail #California #LosAngeles #Anaheim #socaltransit
At tonight's #MetroLosAngeles Westside & Central Service Council meeting at 6:00 PM, on our agenda is Metro's Mobility Plan for the 2028 Olympics.
Also on the agenda is the Link Union Station project which will enable "run-through" service at Union Station. The Link US project is as important to Southern California #metrolink regional and #Amtrak intercity rail as the "downtown connector" was to Metrorail transit. Details at https://www.metro.net/calendar/westside-central-service-council-10/.
#LosAngeles #transit #socaltransit
Final EIR adopted for the #MetroLosAngeles Southeast Gateway Line between Los Angeles Union Station and Artesia. This line will be a tremendous boon to southeast Los Angeles County.
https://la.urbanize.city/post/metro-board-adopts-final-eir-southeast-gateway-line