#cruise #portofseattle
Seattle Cruise Control | Stop Cruise Ship Expansion in Seattle https://seattlecruisecontrol.org/
Why the Port didnât fix the âPath Narrowsâ south of the removed Interbay trail bridge
When the Port of Seattle initially announced the Terminal 91 Trail bridge removal project back in 2023, they were also planning to widen the âPath Narrowsâ pinch point where the fences squeeze the trail just south of the old bridge. So when folks like Bob Svercl went to give the new trail a ride, they were surprised to find that while the bridge has been replaced with a smooth and wide trail, the 5-foot-wide pinch point is still there.
Post by @bobco85 View on Mastodon
Bob measured and found that from fence-to-fence, the width is about five feet, but the usable width is even skinnier. So Bob went back to the project website and realized that all mentions of the pinch point had been scrubbed. He then checked the Wayback Machine, and sure enough this spot used to be listed. So Bob asked the Port why the Path Narrows were still there, and Project Manager Mark Longridge said they did not figure out an easement agreement with BNSF in time and didnât want to delay the bridge project:
âThe southern pinch point is constrained by the BNSF property line on the east side, and an existing port building and roadway to the west. Unfortunately, we were not able to work out an easement with BNSF to move this alignment east without impacting their yard road and did not want to delay the bridge removal and other parts of the work any longer waiting for a possible design solution for the south pinch point. The good news is that the building to the west is now slated for removal in the next couple of years as part of a bigger project and the plan is to potentially realign the road to address this remaining narrower section. While we would have preferred to do all of this work together, we wanted to get as much of the trail fixed as soon as possible.â
-- Advertisement -- The project website initially included widening the âSouth Pinch Pointâ AKA âThe Path Narrows.âSo the pinch point is still on the to-do list, and the overhead sign gives it a great name: The Path Narrows. Not quite as famous as the Tacoma Narrows. Before the bridge was removed, the Narrows were just one part of a string of pinch points and awkward spots, but now that it is all alone it really stands out.
Also, a note to project teams: Please donât just remove things from official materials without adding comment explaining why. I think most people would accept the Portâs explanation about issues fixing this pinch point. A similar issue came up in a much worse way this summer when Seattle Parks quietly removed most of the planned safety upgrades from the Lake Washington Boulevard project and then did not mention the cuts at all when publicizing the new much shorter upgrade list. We had to use the Wayback Machine to find those cuts, too.
#SEAbikes #Seattle
With the bridge over nothing removed, the Terminal 91 Trail in Interbay reopens Thursday
Screenshot from a Port of Seattle video.The skinny trail bridge over a driveway in Interbay that the Port of Seattle has not used for decades is now gone along with the various pinch points it created. The Port will reopen the trail on schedule Thursday morning (October 2), one month after the closure began.
Reopening the trail is great news for folks who have been dealing with a poor detour route for the past month that put two-way trail use on one skinny sidewalk on the Magnolia Bridge. It also required using a spiraling ramp with tight turns that are not particularly comfortable to ride for all users.
The reopened trail is at ground level, and the Port says the space for the trail will be widened to remove the old choke points where only one person could fit at a time. This is a significant improvement to the Elliott Bay Trail, which became a lot more useful when the downtown waterfront bikeway opened. We wonât see the trail in its full glory until the Myrtle Edwards Park remake project (âElliott Bay Connectionsâ) reopens all the park paths, likely next year. Until then, people walking and biking will share a single path. Itâs certainly usable, but you gotta be patient because there are often a lot of people.
Watch workers tear down the old trail bridge (though I donât know why they keep calling it a âbridge to nowhereâ when it definitely went places. It was more like a âbridge over nothingâ):
#SEAbikes #Seattle
The Port of Seattle is making some long-needed changes to the section of the Elliott Bay Trail that travels through the Terminal 91 rail yard in Interbay, including widening pinch points and removing the steep and skinny trail bridge. The trail will be closed for a month starting September 2, and the marked detour will direct trail users on a meandering route that includes a very skinny sidewalk on the Magnolia Bridge.
âThis project will improve the Portâs segment of the trail including removing the bike bridge, widening the narrow areas, and providing new paving,â according to the project website. We reported on the $1.525 million project back in 2023, but work got delayed a year from the original summer 2024 target.
The marked detour will route people off the trail at the E Galer Street Flyover bridge, then down a spiral to the west sidewalk on 15th Ave W. From there, riders would use the south sidewalk on the Magnolia Bridge and down the ramp to meet up with the path on the west side of the terminal at Smith Cove Park. I walked through this detour route (with photos) in a 2023 post about a similar trail closure for repaving work. This time the Port plans to add some water-filled barriers along the Magnolia Bridge sidewalk, which wonât solve the width problem but might make it feel a little more comfortable. The sidewalk is not wide enough for two-way travel, so you will need to be patient and careful when squeezing past other others. People with wide bicycles (trikes especially) should probably consider a different route.
This one sidewalk on the Magnolia Bridge will handle all walking and biking users traveling in both directions.Hmm, are we sure there wasnât a better spot for this street lamp post?The other option is to ride on 15th Ave W between the Galer bridge and W Dravus Street. 15th has bus lanes and sidewalks but feels like a highway. I would personally take the Magnolia Bridge route instead, though 15th would certainly be faster.
Itâs frustrating that the Port again did not figure out a way to do a ground-level detour. When we asked about coning off a temporary path through the terminal back in 2023, a Port spokesperson told Seattle Bike Blog, âTerminal 91 is a working facility with no sidewalks or bike lanes. It is not safe to detour through a working terminal. We are taking feedback on this detour seriously and are raising it with the local transportation agency. We agree there should be a better back-up solution for the future.â Unfortunately, there is still no such back-up solution.
In the end, the result should be a big improvement for biking on one of Seattleâs most unique trails. Built in the late 1980s, the path provides a useful biking and walking connection and one of the more memorable city exploration experiences as riders emerge from industrial Interbay, possibly riding next to 737 fuselages traveling the rails, to a blindingly stunning vista across Elliott Bay.
#SEAbikes #Seattle
Terminal 91 section of the Elliot Bay Trail will be CLOSED September 2-October 2 as part of a rebuild project.
THERE WILL BE A POSTED DETOUR. It'll be longer and involve the Magnolia Bridge, but it'll be there.
Deets:
https://www.portseattle.org/projects/terminal-91-trail-improvements
#seattle #BikeTooter #closure #PortofSeattle #Magnolia #biking #BikeTrail
The Port of Seattle's Terminal 91 Trail is part of the Elliott Bay Trail, the main waterfront trail route along the Puget Sound. Open to those walking, rolling, or jogging, the trail provides a scenic commute helping to avoid busy intersections and city streets between Interbay and Downtown. It runs safely around some of Seattleâs most productive maritime industrial facilities, including the Portâs Terminal 91 which serves as homeport to the Alaska Fishing Fleet and the Smith Cove Cruise Terminal. Trail users also encounter the towering grain elevators at the Portâs Pier 86.
We're proud to announce our endorsed candidates and ballot measures for the upcoming August primary election! đ§”
Congrats to all of our endorsed candidates, and thanks to all 197 community members who attended the meeting.
#Endorsement #Seattle #KingCounty #SeattlePublicSchools #PortOfSeattle
"Not a single international #cargo ship at the #PortOfSeattle. The port is dead. The last ship from China will dock at a West coast port on the 29th, and the last Chinese ship will dock on the East coast around May 10th. After that, there will be no more shipments arriving from #China. Weâre screwed." - Lizzy TishâŹ
Stevedores, Freight Forwarders, Warehousing, trucking, bunkering, chandelling, waste, crane operators, project managers, local cafés #tariffs
VESSELS
https://www.vesselfinder.com/ports/USSEA001
Port of Seattle says ransomware breach impacts 90,000 people
Port of Seattle, the U.S. government agency overseeing Seattle's seaport and airport, is notifying roughly 90,000 individuals of a data breach after their personal information was stolen in an August 2024 ransomware attack.
#Seattle #PortOfSeattle #databreach #ransomware #malware #security #cybersecurity #infosec #hackers #hacking #hacked
âPort of Seattle, the U.S. government agency overseeing Seattle's seaport and airport, is notifying roughly 90,000 individuals of a data breach after their personal information was stolen in an August 2024 ransomware attack.