"Crosslake Connection opens March 28" by Sound Transit - The next phase of the 2 Line in #Seattle will open March 28 across Lake Washington between downtown Seattle and Bellevue via the I-90 floating bridge. Delays in construction around the bridge prevented the entire 2 Line from opening all at once, leaving a gap in the light rail network at the lake. 2 Line trains will run between existing terminus stations at Lynnwood and Redmond. https://www.soundtransit.org/get-to-know-us/news-events/news-releases/crosslake-connection-opens-march-28 #transit #PNW

