I like #fission #boiler #steam #power but if you start putting blocks of #solar panels down and connecting them to substations you can do it in many places and in sequence, and each 1000 kW you do is another 300 kWh per day. Add a #battery here and there, and you spread that through the whole day.
Fission takes a #decade, or perhaps 5 years (or 30) before a turbine spins a generator, and yes, all day and a GW but power next #winter is highly valuable.
And #wind, onshore...