House construction: this was the part that had us all the most nervous. Dropping the last ~100kg piece of stone bathroom floor into place with like 0.7cm of clearance all around. Went as smoothly as it could have, though.
Floor (and partial wall) complete. Tomorrow we measure for the remaining walls.
@steve grain matched too💰beautiful