#FERC has been foot dragging on #Decarbonization for some time now. During that time, the unexpected architecture for the #NewGrid has emerged (Interconnected #Batteries). It will no longer be about #Baseload and #Generation by #FossilFuel or #ECOKiller platforms, but about 100% #Renewables charging #BESS & #LDES sites & serving load as required. Now, Get the job done. https://www.nytimes.com/2024/05/13/climate/electric-grid-overhaul-ferc.html?smid=nytcore-ios-share&referringSource=articleShare
New Rules to Overhaul Electric Grids Could Boost Wind and Solar Power

The Federal Energy Regulatory Commission approved the biggest changes in more than a decade to the way U.S. power lines are planned and funded.

The New York Times