The 1920 Treaty of Trianon broke a lot of railway lines, and three of those former lines – now at the Hungary-Serbia border – are to be checked today. A long but flat cycle route will take me to the borders #CrossBorderRail
Kislunhalas. Like Kelebia yesterday the works are almost complete. #CrossBorderRail

#CrossBorderRail Conclusions Tour Bus 3 of 6
7807 KISKUN replacement bus
08:03 Kiskunhalas/vá. - Jánoshalma 08:33
MÁV

Bus type: MAN bendy bus
⛽️
🚲: ⛔️
🦽: ✅
🛜: ⛔️
🍽️: ⛔️
🧳: 🙂 (multi use spaces and overhead racks)
🧽: 🙂

Route of the vehicle: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#12/46.3592/19.4671

This pulled up at my B&B earlier. It wasn’t for me 😀 #CrossBorderRail
Kiskunhalas 🇭🇺 is a very good cycling town. Lots of bike lanes. And a big bike park at the morning market. #CrossBorderRail

Places I’ve been on #CrossBorderRail with surprisingly good bike infra

Kiskunhalas 🇭🇺
Banja Luka 🇧🇦
Subotica 🇷🇸

These are not rich places. But there’s an old cycling history, and a little investment is basic infrastructure - and it works!

#CrossBorderRail Conclusions Tour Train 30 of 75
IR 7807
08:38 Jánoshalma - Bácsalmás 08:57
MÁV

Train type: Vagonka Studenka 117 Bzmot Railbus, 1 short carriage
⛽️
🚲: ❓(not officially but you’d manage)
🦽: ⛔️
🛜: ⛔️
🍽️: ⛔️
🧳: 😐 (high steps to get in, narrow doors)
🧽: 😐 (orderly, but it needs a good clean)

🎫 Interrail: 🙂 (accepted)

Pedal to the metal! 💨#CrossBorderRail

(This train type is meant to do max 80km/h)

IR 7807
08:38 Jánoshalma - Bácsalmás 08:57

Distance: 22.5km
Average speed: 71km/h

2 stops:
Mélykút
Bácsalmás

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#12/46.2214/19.3308

#CrossBorderRail

#CrossBorderRail 2025 Conclusions Tour

The #CrossBorderRail 2025 conclusions tour - mainly to go to events, but adding a few new borders too. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service. All lines on the map are TRAINS, unless otherwise shown with icons along the lines - 🚲 for bike, 🚌 for bus, 🚗 for car, ⛴️ for ferry. Click each line to get basic information what it is.

uMap

I think this must be the most tightly timetabled train I’ve taken on #CrossBorderRail

The train’s max speed is 80km/h. We have one interim stop. And we *average* 71km/h.

There’s even a tarmac platform. What the hell is this? Someone has paid attention to a Hungarian branch line? #CrossBorderRail

#CrossBorderRail Conclusions Tour Bike 8 of 17
Bácsalmás - Hercegszántó

Distance: 68.2km
Est. duration: 4:30

This bike route, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#12/46.0394/19.0747

I was meant to be at an event about Eurovelo routes today (until the European Cyclists Federation cancelled me after I’d planned my trip). Instead I’m cycling part of Eurovelo 13 and it’s kilometres of sand 😡 #CrossBorderRail
That’s where the #CrossBorderRail line to Katymár 🇭🇺 - Ridjica 🇷🇸 used to run
12km to Gara. That ought to have some #CrossBorderRail 🤪

And that’s #CrossBorderRail Gara 🇭🇺 - Ridjica 🇷🇸

Long gone too. The building in the middle is the former station Gara

And a #CrossBorderRail investment opportunity! The old Dávod station is for sale
And that’s #CrossBorderRail Hercegszántó 🇭🇺 - Backi Breg 🇷🇸

#CrossBorderRail Conclusions Tour Bus 4 of 6
5335/436
13:15 Hercegszántó, autóbusz-váróterem - Baja, autóbusz-állomás 14:05
Volánbusz

Bus type: Volvo 3 axle
⛽️
🚲: ⛔️
🦽: ✅
🛜: ⛔️
🍽️: ⛔️
🧳: 😐 (stupid design - space for overhead racks but has none)
🧽: 🙂

Route of the vehicle: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#12/46.0713/18.9360

#CrossBorderRail Conclusions Tour Train 30 of 75
IR 7804
15:14 Baja - Sárbogárd 16:55
MÁV

Train type: Siemens Desiro DMU, 2 short carriages
⛽️
🚲: ✅
🦽: ❓(step free if platform allows but here there’s barely a platform)
🛜: ⛔️
🍽️: ⛔️
🧳: 🙂 (great design - huge overhead racks, space between seats)
🧽: 🙂

🎫 Interrail: 🙂 (accepted)

As the dhhh duddle-dh duddle-dh MÁV jingle rings out here at Baja, enjoy MÁV‘s many jingles #CrossBorderRail https://youtu.be/kLk_Gt3KIro?si=7c0PZcV9FKMDJbYJ
MÁV-START Signal

YouTube

IR 7804
15:14 Baja - Sárbogárd 16:55

Distance: 103km
Average speed: 61km/h

13 stops:
Pörböly
Alsónyék
Bátaszék
Decs
Őcsény
Szekszárd
Tolna-Mözs
Fácánkert
Tengelic
Nagydorog
Vajta
Cece
Sárbogárd

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#10/46.5428/18.7798

#CrossBorderRail

#CrossBorderRail 2025 Conclusions Tour

The #CrossBorderRail 2025 conclusions tour - mainly to go to events, but adding a few new borders too. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service. All lines on the map are TRAINS, unless otherwise shown with icons along the lines - 🚲 for bike, 🚌 for bus, 🚗 for car, ⛴️ for ferry. Click each line to get basic information what it is.

uMap

Bátaszék

Classic Austro-Hungarian station

#CrossBorderRail Conclusions Tour Train 31 of 75
IC 803
17:00 Sárbogárd - Budapest-Keleti 18:05
MÁV

Train type: Alstom Astride BB36000 locomotive, 5 carriages
⚡️ (25kV ac)
🚲: ✅
🦽: ❓(there’s space on board, but there was barely a platform - a lift maybe?)
🛜: ⛔️
🍽️: ✅
🧳: 😐 (hard to get in, high narrow steps)
🧽: 🙂

🎫 Interrail: 😐 (needs compulsory reservation, costs less than €3)

IC 803
17:00 Sárbogárd - Budapest-Keleti 18:05

Distance: 90.6km
Average speed: 84km/h

2 stops:
Budapest-Kelenföld
Budapest-Keleti

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-conclusions-tour_1266988#10/47.1710/18.6617

#CrossBorderRail

#CrossBorderRail 2025 Conclusions Tour

The #CrossBorderRail 2025 conclusions tour - mainly to go to events, but adding a few new borders too. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service. All lines on the map are TRAINS, unless otherwise shown with icons along the lines - 🚲 for bike, 🚌 for bus, 🚗 for car, ⛴️ for ferry. Click each line to get basic information what it is.

uMap
As I’m in Hungary currently for #CrossBorderRail a few people have asked me if I’ve seen the Adam Something new video about MÁV. Given that channel often plays fast and loose with facts dare I watch it? Or is it just going to make me angry?

@jon i came across it earlier and found it entertaining but not particularly credible

probably worth watching so you know what other people have been exposed to

@jon Uuuugh, the MAV Astride 🥰🥰🥰 !
@lewd Common on the ICs to Pecs it turns out.
@jon is that an old push-pull DVT hooked up on the "wrong" end?
@outfrost Yes! It can’t work with this locomotive type
@jon It's been almost 15 years since I was in Hungary, but that first jingle still rings in my head at nearly perfect fidelity, followed by an incomprehensible Ansage from an unknown man that sounds fitting for Half Life II's City 17.