@wmeehan @ndhapple Yeah, DeKalb is a problem because of an interaction between interlining and how every service through the junction runs on a separate non-Takt timetable; making everything run on the same headway makes things easier to run. Peak traffic on the Bridge was 38 tph in 2015 and may have been higher before 2010, I forget, so moving to 40 with each service running on the same consistent headway all day should not be a problem.