"#Antwerp premiers electric #ferry and it's extremely quiet "

The new vessel was produced in #estonia, cost 5.5 M€ and it will transfer pedestrians (150) and #bikes (75)

It will be charged every hour during its round trips, with the charging station located on the left bank in #Linkeroever.

https://www.themayor.eu/en/a/view/antwerp-premiers-electric-ferry-and-it-s-extremely-quiet-11292

Antwerp premiers electric ferry and it's extremely quiet

Antwerp premiered its first electric ferry boat to help pedestrians and bikes cross the Schledt River. It is the second electric ferry in Belgium. The vessel was produced in Estonia and it is CO2-neut..

TheMayor.EU