In the @esoastronomy technical building is the integration hall, where there is more hardware related to the ELT telescope.
In the corner there is a prototype section of ELT primary mirror support structure with 7 aluminium dummy mirror segments on it.
The blue structure is the ELT Phasing & Diagnostic System (PDS), currently under construction. This instrument will be installed on the telescope to measure the shape of the primary mirror, allowing the positions of the 798 mirror segments to be adjusted so that they are perfectly aligned and can act as a single 39 metre diameter mirror.
It is expected that the PDS will be used roughly once a week to tune the primary mirror. Between tune ups the edge sensors between the mirror segments will be used to maintain the mirror's shape.
https://elt.eso.org/mirror/M1/
#Astrodon #Astronomy #MAVISFDR