Snapshot of Jeanne d'Arc Station - November 20, 2023
https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-jeanne-darc-station-november-20-2023
https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-jeanne-darc-station-november-20-2023
| RailFans.ca | https://www.railfans.ca |
| Discord | https://discord.railfans.ca |
| YouTube | https://youtube.railfans.ca |
| X (formerly Twitter) | https://twitter.railfans.ca |
MEMO: O-Train Stage 2 South – Successful Operation of Nine Trains Begins.
TransitNext, the contractor responsible for building, testing, and maintaining the system, has begun demonstrating the ability to safely operate nine trains, the number required for revenue service, on Line 2, between Bayview and Limebank stations, and on Line 4, between South Keys and Airport stations.
Enjoy this extensive look at #Stage2LRT in #Ottawa, bringing rail further east, west and south. We have full coverage on the project from the routing and station designs, to actual construction site visits, to discovering the new trains.
(THREAD so keep reading below)