42 Followers
152 Following
176 Posts
Process engineer. Energy, infrastructure, industrial decarbonisation. P(๐ŸŒŽnet0|โ˜ข๏ธ๐Ÿ“‰) << P(๐ŸŒŽnet0|โ˜ข๏ธ๐Ÿ“ˆ). Spelling mistakes and missing spaces my phones fault! Views my own. was @Ember421
There are a few useful lessons from the last day in Alberta. Iโ€™m sure there will be many more after it all clears up.
1) The winter effective load carrying capacity of combined wind and solar in central NA is approximately *zero* during peak load events.
2) Contrary to many arguments, in this context VRE needs a 100% load backup, sized for peak demand.