Blackout on the Iberian Peninsula: ENTSO-E presents final report

After the blackout in Spain and Portugal in April 2025, the final report shows: Renewable energies and lack of automation played a role.

https://www.heise.de/en/news/Blackout-on-the-Iberian-Peninsula-ENTSO-E-presents-final-report-11224775.html?wt_mc=sm.red.ho.mastodon.mastodon.md_beitraege.md_beitraege&utm_source=mastodon

#Automatisierung #Energie #Energiewende #Stromversorgung #Windkraft #Wirtschaft #Wissenschaft #news

Blackout on the Iberian Peninsula: ENTSO-E presents final report

After the blackout in Spain and Portugal in April 2025, the final report shows: Renewable energies and lack of automation played a role.

heise online