The NASA Artemis II mission is targeted for launch as early as Feb. 6.

NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen will complete a 10-day journey around the Moon and back (no moon landing) to test systems and hardware, in preparation for future lunar landing missions.

It will be the first crewed mission to the vicinity of the Moon since Apollo 17 in 1972.

Launch vehicle: Space Launch System (SLS)
Spacecraft: Orion

https://www.nasa.gov/news-release/nasa-invites-media-to-cover-artemis-mission-from-johnson-space-center/
1/n

NASA is targeting Sat. Jan 17 for the rollout of the Artemis II SLS rocket and Orion spacecraft for final integration, testing, and launch rehearsals.

The 4-mile journey to the launch pad at KSC using the crawler-transporter-2 will take ~12 hours. After system checks and tests, astronauts will conduct a final walkdown at the pad.

At the end of Jan, NASA will conduct a wet dress rehearsal, including fueling and unfueling of the rocket without astronauts onsite.

https://www.nasa.gov/missions/artemis/artemis-2/final-steps-underway-for-nasas-first-crewed-artemis-moon-mission/
2/n

Knock knock!

It is NASA’s crawler-transporter 2 arriving at the Vehicle Assembly Building at KSC for a pick-up!

Tomorrow morning Jan. 17, at ~7 a.m. EST. it will transport NASA’s Space Launch System (SLS) rocket and Orion spacecraft + Mobile Launcher to Launch Pad 39B in preparation for the Artemis II crewed mission around the Moon on ~6 Feb.

At about one mph, the four-mile journey will take 10-12 hours.

Livestream starts at 7 a.m. at https://www.youtube.com/watch?v=nrVnsO_rdew

https://www.nasa.gov/blogs/missions/2026/01/16/artemis-ii-moon-rocket-ready-for-big-move/
3/n

@AkaSci Must be fun to parallel park in a (very slow) hurry. 🤣