I had to buy some power extension cables since it is very hard to plug the Zigbee controllers directly into the back of my UPS.
Unfortunately I'll have to shutdown my NAS again to get everything all connected, though it will be a good time to also add a power monitor and install the new array of HDDs on my hypervisor system.
It must be a maintenance night for my home network!