The driver has arrived, switches on engine, does a few brake tests, turns on the lights and we're allowed to board. ๐ซด
Indoors are worn but clean. The buttons allow the reclining of seats. The fixation of the table is a bit strange and in my feet.
Punctual departure and a 15min underground ride through the Zaragoza stations of #Portillo, Goya and #Miraflores. Out of the tunnel into the Ebro plain towards Huesca. UIC electrified single track next to us, used by (few) #AVE through services to #Huesca. The train is pretty full, about 40 people in my carriage, so maybe 80 in total.
Villanueva de Gallรฉgo - One person getting on.
Technical stop in #Zuera to let another train pass towards Zaragoza.
People are now standing. As the conductor passed to check the tickets, she confirmed everyone's destination. The large majority is going to #Canfranc! That makes me very happy. And I wonder if a third train would be a good idea?
From here it gets interesting... Big passenger exchange, both on and off. Train almost as full as before. We reverse. I'm now seated in the direction of travel ๐
Second picture is the branch off to #Canfranc, taken on the way into Huesca. Going via Huesca considerably extends the travel time. But I guess it's needed in terms of connectivity.
The gauge change facility looks unused and the track there is not electrified. Strange...