Finally an orbital launch from India after a long gap!

NOTAM issued for SSLV-D3/SR-0. Enforcement duration 2330-0330 (UTC), 28 to 30 July 2024 with other launch windows available till 27 August.

#SSLVD3 #ISRO #Spaceflight

Long awaited SSLV-D3 launch now delayed to 15 Aug (NET)

New NOTAM issued has enforcement duration between 0430-0830 (UTC), 15 to 27 August 2024

#SSLV #SSLVD3 #ISRO #NOTAM

Brought forward NET date a bit.

New NOTAM has enforcement duration between 0315-0715 (UTC), 7 to 27 August 2024.

#SSLV #SSLVD3 #ISRO #NOTAM

SSLV-D3: Launch date seems to be firming up further. New NOTAM with enforcement duration 0315-0715 (UTC), 7 to 9 August 2024

#SSLVD3 #ISRO #SSLV

Another delay...

SSLV-D3/EOS-08: New NOTAM with enforcement duration 0315-0715 (UTC), 15 to 27 August 2024

#ISRO #SSLV #SSLVD3

EOS-08 Mission Overview

One day bump.. SSLV-D3/EOS-08 launch now on 16 August 2024.

#NOTAM #SSLVD3 #EOS08

The launch of SSLV-D3 developmental flight

YouTube

Four objects tracked:

24147A(60454),i,a×p = 37.39°, 524×444
24147B(60455),i,a×p = 37.40°, 511×412
24147C(60456),i,a×p = 36.70°, 391×388
24147D(60457),i,a×p = 37.37°, 475×432

Leaving two spent stages (SS3, VTM) in orbit isn't exactly neat! (especially if they can break up..)

#SpaceDebris #ISRO

GNSS-Reflectometry (GNSS-R) instrument on the EOS-08 satellite commenced operations on August 18, 2024.

https://www.isro.gov.in/GNSS_Reflectometry.html

#SSLVD3 #EOS08 #Reflectometry

GNSS-Reflectometry: A Novel Remote Sensing Initiated by EOS-08

Electro Optical-Infrared (EOIR) payload on EOS-08 began operations on 16 August 2024.

https://www.isro.gov.in/EOIR_Payload.html

#SSLVD3 #ISRO #SSLV #EOS08

EOIR Payload on EOS-08 Begins Operations, Offering excellent Thermal Imaging Capabilities