So I've got this empty concrete pad on the side of my house.
It used to have a rotted out 12x24' shed on it, but I demolished that last fall and figured I could do something better... 🧵
So I've got this empty concrete pad on the side of my house.
It used to have a rotted out 12x24' shed on it, but I demolished that last fall and figured I could do something better... 🧵
Day one was grinding down the high spots with a diamond cup wheel. $75 for the cup wheel and corded angle grinder.
Day two is opening up the cracks with a diamond cut disc and filling them with crack sealer. $40 for the diamond discs and crack filler.
One shed, some assembly required.
I guess I'm freaking committed now.
My dad volunteered to come down and help me restack all of the lumber inside of the fence and all in its own piles so I can get to all of it.
Only took the two of us about 2 hours to shuttle everything back there.
The inaugural mistake! I meant to leave that stud out so I'd have room to nail the header in.
So I guess we've moved to the "improvising" stage of this project.
The second panel went together much faster.
The site supervisor is sleeping in my office.
At that point we were ready to start putting rafters in the air, so why not?
The palm nailer was amazing for driving the hanger nails 11 feet up on an extension ladder. Easily the best $30 I've ever spent at Harbor Freight. Anyone who has an air compressor should pick one up; they're just so handy for driving nails in awkward tight spaces.
Climbing the learning curve on applying zip system flashing tape this morning. Glad I started on the walls and not the roof.
And before you ask; yes, I rolled the tape. #zipsystem
T-50 staples weren't cooperating going into the OSB, so while my gun isn't technically rated for them, you ARE able to buy 3/8" narrow crown staples. Short enough to not poke all the way through the 1/2 roof decking, but rigid enough to not be giving my any trouble stapling the insulation baffles to the bottom of the roof deck.
These baffles are because I'm doing a vaulted / cathedral ceiling in here, so this guarantees an air gap / path between the ceiling insulation and the roof decking. This allows air to flow from the lower soffit to the upper soffit to transport away any moisture that accumulates in these rafter bays and keeps the shingles cooler by having circulation behind them.
We are getting tantalizingly close to laying down the roof! All of it fits nicely in my pickup too.
Doesn't look too bad when it's all neatly piled on the ground. I'm sure I'll be fine and this part will be easy.
I'm shooting the trim paint on the fascia and rake boards before doing the roof. I figure it's easier to paint it now before I put the drip edge over it.
The dog only got lightly misted with white paint. She still mostly looks black.
@lechner People keep asking me if I'm building an ADU
"Nah, just a detached workshop"
"ok... but really... you're building an ADU, right?"