The full blade set for the Vestas 15 MW prototype offshore wind turbine has arrived to Østerild National Test Centre in Denmark where they will be installed.
[This one blade is longer than Utrecht's Dom tower, my own point of reference ;)]
https://www.offshorewind.biz/2022/12/22/vestas-v236-15-0-mw-blades-reach-final-destination-photos/
Vestas V236-15.0 MW™ Blades Reach Final Destination – Photos

The full blade set for the Vestas V236-15.0 MW™ prototype offshore wind turbine has arrived to Østerild National Test Centre in Denmark where they will be installed. The blade set arrived at the port of Hanstholm on Sunday, 18 December, and was then transported to Østerild National Test Centre. The 115.5-metre blades for the prototype […]

Offshore Wind
There's a reason that production lines for (components) of these offshore wind turbines are preferably located in or near sea ports ;)
But onshore wind turbines are becoming larger too.
Adding this one from Vestas. Click to expand ;)
@Sustainable2050 Related (Endesa, Teruel, Spain)