Slowly but surely chipping away at my lengthy todo list, which is implemented in multiple Gitea repos + Obsidian.
The oldest issues I'm tracking are 9+ months old. My latest sweep looks at the oldest, and I ask myself whether I should do this now or whether it can wait for 3 or 6 months.
Can it wait? I close it and copy the detail to Obsidian. I'm keeping a list of things to review on the fall equinox and another list for the winter solstice. Tucked away, but not to do now.
Reduce WIP.