closer pics of the pins :3
some are crashdoom’s or stuff from BLFC
closer pics of the pins :3
some are crashdoom’s or stuff from BLFC
Some WIP photos. I’m having to slowly pick up where I left off working on the rack. I’m on meds and doing better for the most part now.
Thanks for your patience during the last year!
Doing transfers to the new server (on the stool) from the old server (silver pair of 1u roughly at the same height in the rack)
Kinda looks amusing.
Once we are sure we know what we are doing, we’ll be moving pawb into this single machine to speed up pawb and increase reliability.
This thing has like 80 threads and 320gb of ram. It’s been a dream to work on, so thanks for the donations that made it possible! ~<3
Did some cleanup on the network rack today. Need to put another proper switch in the bottom slots for some new in wall Ethernet.
Definitely not done yet. The last pic is a bunch of color coded Ethernet guides for the server rack tomorrow.