The construction of the east river's edge trail between Leonard St and Ann St has reached its midpoint. Completion is expected by the end of the year.
[aside: wow, this articles is obsessed with the funding, but kudos to MLive for covering some aspect of something in detail] #GrandRapidsMI 🚴♂️
https://www.mlive.com/news/grand-rapids/2026/06/grand-rapids-marks-midpoint-of-96m-grand-river-trail-project.html
[aside: wow, this articles is obsessed with the funding, but kudos to MLive for covering some aspect of something in detail] #GrandRapidsMI 🚴♂️
https://www.mlive.com/news/grand-rapids/2026/06/grand-rapids-marks-midpoint-of-96m-grand-river-trail-project.html
