EDIT: they came today for some excavations, will come back on Monday to activate it
After "only" 23 months of waiting time...on Friday morning they'll come to install the 2.5G/1G FTTH! 🎉 🥳
EDIT: they came today for some excavations, will come back on Monday to activate it
After "only" 23 months of waiting time...on Friday morning they'll come to install the 2.5G/1G FTTH! 🎉 🥳
While over here we have a data provider which is in competition with the first provider. They are pulling kilometers of fiber optic cable, per day, in the street {air mounts} to the Fibre Access Terminals FAT, to get as much people connected as possible.
The first provider has done something that I've spoken before and we still don't have the cable in the street let alone the Fibre access terminals from them