HS2 could cost up to £102.7bn and trains will be slower than first planned

The new cost range and train speed are being announced as a "reset" of the delayed, over-#budget and vastly scaled-back project is carried out.

https://www.bbc.com/news/articles/c794xw7p2dqo?at_medium=RSS&at_campaign=rss

(c) #BBC #News

HS2 could cost up to £102.7bn and trains will be slower than first planned

The new cost range and train speed are being announced as a "reset" of the delayed, over-budget and vastly scaled-back project is carried out.