The madness of the UK's energy system is summed up in the £55m paid to wind farm operators in the last couple of months to cease generation (temporarily) because the energy interconnection (distribution) system was unable to handle the electricity transfer from generation to use; at the same time £217m was paid (mainly to gas-based generators) to make up the shortfall in renewable energy the congested network caused.

The network build-out needs to be accelerated!

#energy
h/t Observer

@ChrisMayLA6 How much grid upgrade would that £272m have paid for? - would it have been enough to make a difference, or are we talking many, many billions?

@TimWardCam

Good Q. likely at the margins unfortunately