The madness of the UK's energy system is summed up in the £55m paid to wind farm operators in the last couple of months to cease generation (temporarily) because the energy interconnection (distribution) system was unable to handle the electricity transfer from generation to use; at the same time £217m was paid (mainly to gas-based generators) to make up the shortfall in renewable energy the congested network caused.

The network build-out needs to be accelerated!

#energy
h/t Observer

@ChrisMayLA6 Along with storage alongside generation so you can buffer excess power when the grid is saturated. That can be built much faster than interconnects.

@bjn

Yes, fair point & one I have made in the past myself... but failed to do today 😉