The new verification is ready and it would take 140 days to run on my Apple M1 MBP or 12 days on my Epyc machine. I should probably add some checkpointing in case it needs to be restarted.
The epyc machine is very noisy though when fully loaded so maybe I'll run the verification on one of my work devservers. They are much slower but I don't care if it takes a week or so more.
@ahornby@vitaut@horenmar@fanzeyi I built one of these just before RAM skyrocketed because I saw that writing on the wall; can confirm, it can be quiet⦠if you want to throw a big enough rad at it.