#Metrolinx finally admits what everyone has been expecting, the Ontario Line will open later than 2031

It might also require closures of the DVP for some crucial engineering work (the line will go over the freeway)

https://www.theglobeandmail.com/gift/078c2648db74ada8e941a3cb1a03810f8182d0d158b89e665d7824ada193f24c/O2L5YCZQQ5C4DC4GREOLJRVON4/

#OntarioLine #Topoli

Toronto’s Ontario Line could open later than 2031 target, Metrolinx says

CEO Michael Lindsay says construction may necessitate shutting down a major expressway

The Globe and Mail
@jerome It would be a terrible shock if any civic infrastructure project finished in the projected year.