Welcome to today's thread - 2025 #CrossBorderRail Finale Day 27 - 13 July - Oradea - Valea lui Mihai - Satu Mare - Halmeu - Satu Mare - Sighetu Marmației

Today's new borders:
Halmeu 🇷🇴 - Nevetlenfolu 🇺🇦
Câmpulung la Tisa 🇷🇴 - Teresva 🇺🇦

Borders map, inc. borders re-crossed:
https://umap.openstreetmap.fr/en/map/crossborderrail-all-the-borders_935041#14/48.0007/23.0035

Today's trains on the routes map:
https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#10/47.5404/22.8770

One of the few active lines Romania-Ukraine, but freight only and poorly connected on both sides of the border, the question is whether any passenger traffic through Halmeu would even make sense? Today I will work this out. Then onwards by bus to end the day.

Here's today's #CrossBorderRail music track

Trenul Cursă de Persoane Apahida Cluj-Napoca
Semnal M

Thanks @db for this very special track!

https://www.youtube.com/watch?v=PtHVQvMAt2c

Semnal M - Trenul Cursă de Persoane Apahida Cluj-Napoca (Passenger Train from --) [1979]

YouTube

Here's today's intro video - hopefully this one worked!

https://peertube.netzbegruenung.de/w/gJhMu1iDaukVbs1qRUrakX

#CrossBorderRail live stream - 7/13/2025, 4:11:15 AM

PeerTube

#CrossBorderRail Finale Train 126 of 166
R 4333
07:35 Oradea - Valea lui Mihai 08:57
CFR Călători

Train type: Siemens Desiro DMU, 2 short carriages
⛽️
🚲: ✅
🦽: ❓ (theoretically possible, but disabled access door is broken)
🛜: ⛔️
🍽️: ⛔️
🧳: 🙂
🧽: ☹️ (ok, I have to put standards of maintenance somewhere, and it goes here - the train is orderly, but it smells terrible and there are loads of cracked window panes)

🎫 Interrail: 🙂 (accepted)

R 4333
07:35 Oradea - Valea lui Mihai 08:57

Distance: 65.7km
Average speed: 48km/h

10 stops:
Episcopia Bihor
Biharia
Tămăseu h
Roșiori Bihor Hm
Diosig
Cadia hc
Săcuieni Bihor
Șilindru
Simion hc
Valea lui Mihai

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#10/47.3174/22.1766

#CrossBorderRail 2025 Finale

The final big #CrossBorderRail tour - to the eastern borders of the EU, and missing intra-EU borders. In June-July 2025. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service.

uMap

And there goes the Romanian border policeman to check the incoming Debrecen - Satu Mare in Valea Lui Mihai, the first Romanian station

Rail passenger here: Schengen doesn’t work

(I was only boarding here so didn’t get checked)

#CrossBorderRail Finale Train 127 of 166
R 6822
10:40 Valea lui Mihai - Satu Mare 11:59
CFR Călători

Train type: Electroputere 60 Diesel, 2 carriages
⛽️
🚲: ✅
🦽: ⛔️ (no way - steps too high, no ramp)
🛜: ⛔️
🍽️: ⛔️
🧳: 😐 (ok once in but hellish to get in)
🧽: 🙂

🎫 Interrail: 🙂 (accepted)

R 6822
10:40 Valea lui Mihai - Satu Mare 11:59

Distance: 67.2km
Average speed: 51km/h

11 stops:
Curtuișeni Hm
Resighea h
Sanislău
Marna hc
Carei
Domănești Hm
Moftin hcv
General Gh. Avramescu
Sătmarel Hm
Satu Mare Sud
Satu Mare

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#10/47.7670/22.5048

#CrossBorderRail 2025 Finale

The final big #CrossBorderRail tour - to the eastern borders of the EU, and missing intra-EU borders. In June-July 2025. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service.

uMap
It really was going this fast 😀

I found the friendliest CFR staff I could imagine at Satu Mare. She fixed all the Interrail reservations I needed for the rest of my trip in Romania.

Pic is of the neighbouring window 😀

Halmeu is weird. The station is orderly but barely has a road leading to it. There are transshipment terminals - at least for grain - but it’s all run down looking.
Shall I send the Westfrankenbahn some feedback from Halmeu 🇷🇴? 😀

Pro tip when travelling on a DB Regio Westfran… oops sorry Interregional Călători 628 DMU

Only one carriage is powered

Travel in the other one - that’s this carriage with no motor under the floor

It’s always quieter and on a hot day might be cooler too

#CrossBorderRail Finale Train 128 of 166
R 10665
12:38 Satu Mare - Halmeu 13:05
Interregional Călători

Train type: Düwag, Waggon-Union, AEG, LHB, MBB 628 DMU, 2 carriages
⛽️
🚲: ✅
🦽: ⛔️
🛜: ⛔️
🍽️: ⛔️
🧳: 😐 (steep steps, low platforms)
🧽: 😐 (graffiti outside)

🎫 Interrail: ☹️ (not accepted, private operator)

R 10665
12:38 Satu Mare - Halmeu 13:05

Distance: 22.5km
Average speed: 50km/h

4 stops:
Ramura Botiz h
Micula
Porumbești hc
Halmeu

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#12/47.8887/22.9441

#CrossBorderRail 2025 Finale

The final big #CrossBorderRail tour - to the eastern borders of the EU, and missing intra-EU borders. In June-July 2025. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service.

uMap

#CrossBorderRail Finale Train 129 of 166
R 10668
15:13 Halmeu - Satu Mare 15:40
Interregional Călători

Train type: Düwag, Waggon-Union, AEG, LHB, MBB 628 DMU, 2 carriages
⛽️

🚲: ✅
🦽: ⛔️
🛜: ⛔️
🍽️: ⛔️
🧳: 😐 (steep steps, low platforms)
🧽: 😐 (graffiti outside)

🎫 Interrail: ☹️ (not accepted, private operator)

Same unit I arrived on.

R 10668
15:13 Halmeu - Satu Mare 15:40

Distance: 22.5km
Average speed: 50km/h

4 stops:
Ramura Botiz h
Micula
Porumbești hc
Halmeu

This train, mapped: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#12/47.8887/22.9441

#CrossBorderRail 2025 Finale

The final big #CrossBorderRail tour - to the eastern borders of the EU, and missing intra-EU borders. In June-July 2025. Each day of the project is a Layer in the map - these should be displayed by default, or if not click the three layered diamonds icon "Open browser" to the left side of the map. The icons are all for borders, roughly coloured to differentiate the borders. A cross through a track means NO TRAINS CAN RUN. A cross through trains but not track means TRAINS CAN RUN BUT NO PASSENGER TRAINS. And TRAIN AND TRACK (no crosses) means there is a passenger service.

uMap

#CrossBorderRail Finale Bus 18 of 24

15:30 Satu Mare - Sighetu Marmației 18:00
Tur Călători

Bus type: Mercedes Sprinter minibus
⛽️
🚲: ⛔️ (there’d be space in hold, but driver is a sod - would he let you?)
🦽: ⛔️
🛜: ⛔️
🍽️: ⛔️
🧳: 🙂 (large hold)
🧽: 🙂

Route of the vehicle: https://umap.openstreetmap.fr/en/map/crossborderrail-2025-finale_1163738#10/47.9019/23.3904

Dear lord will my DIY ever be done? 😀

Never let it be said I don’t like border police

My bus was behind a border police van, and it stopped the bus doing kamikaze overtaking manoeuvres! 😀

Dual gauge infra west of Sighetu Marmației in a sorry state. There were bold plans for this… Let’s hope tomorrow east of here I find better!
@jon
Sighetu Marmației looks like an interesting town. Elie Wiesel was from there. Are you staying in the Hotel Coroana?
@SaareMartha My hotel is right next to the house where Wiesel was born. I have a little time to explore tomorrow!