At #TRACCS RailDay I asked TTC Surface Track dept. about why they use single point instead of double point switches. Apparently the double point switches at Leslie Barns aren’t reliable and are frequently giving misaligned readings. Stuff also gets in the switches in road.
@rmtransit.bsky.social