Starting to strip the cables and connect the wires to the terminals.
How glad I am that triple-deck terminals exist! lol
Starting to strip the cables and connect the wires to the terminals.
How glad I am that triple-deck terminals exist! lol
And on we go!
The second cable bundle has been connected to the terminals. The KNX components are already operational.
Not all actuators are installed yet. Terminal blocks for the KNX cables and reed contacts will also be added. After that, I can continue with the internal wiring.
Have I mentioned that I love wires? lol
Added even more wires. You can never have too many wires!
For thermal reasons, the wires are not bundled, even though it would look nicer. Unfortunately, once the cover is on, none of this will be visible anymore.
Thanks!
You're right, if someone has to work on the system again, then it looks nice and neat.
I would prefer the wires to be bundled, but the free wiring is also better in case you need to trace a connection.
Thank you, I'm glad if you like it!