Tesla Europe needed a way of moving employees at their factory outside Berlin. So they did they Tesla thing, and dug a tunnel and filled it with self-driving cars.
No of course not, they got a train.
Tesla Europe needed a way of moving employees at their factory outside Berlin. So they did they Tesla thing, and dug a tunnel and filled it with self-driving cars.
No of course not, they got a train.
@jwildeboer
They build individual transport means. Of course they will not invest into electrifying tracks.
Announce there will be a highspeed rail project, and they will get hyperloop :P
Are they available on order?
The last project I read was expecting delivery in 2029
And they need trains for material as well, so electrifying it makes sense. But it is a private Track. I read we are talking about few km.
Check
https://www.openrailwaymap.org/?style=standard&lat=52.402471240250776&lon=13.810114860534668&zoom=14
They indicate that it is under construction. So I assume they will switch and might electrify.
So renting some surplus Material doesnt sound too bad.
@wonka
I assume they just grabbed what is on the market. I doubt they do long term planning and accepting the German "ok, in 6 years, that is fine" mentality. They showed that if you throw money at problems you can speed things up (like finding contractors)
and given the transport options for goods it should really be the obvious move to go electric and not batteries.
@wonka
The schedule:
https://www.eberswalde-ffo.de/media/files/rbtes-fahrplan-erkner-tesla-sued.pdf
No, it does not stand still much and most likely will keep running non-stop.