2021年度上海核电产业十大事件

2022-03-09 09:20
来源:上海核电 上海核电 核电设备 高温气冷堆

第四代反应堆——2MWt液态燃料钍基熔盐实验堆项目一批关键设备顺利交货。3月23日,国核自仪研制的全堆控制系统首批设备如期发往甘肃武威项目现场;5月19日和11月17日,上海电气核电设备有限公司承制的金属堆内构件和燃料盐排放罐分别实现交付。

Screen captures from vid (5:30~6:00) in
https://www.cnnpn.cn/article/29563.html
2021年度上海核电产业十大事件

3月17日,上海市人民政府与中国核工业集团有限公司在沪签署新一轮战略合作框架协议。双方商定,将进一步扩大合作空间,促进更多新平台、新项目、新板块落地上海,携手推动产业高质量发展。3月,中核同创(上海)科技发展有限公司在中核科创园注册成立。7月,中核浦原与浙江大学在沪成立“核工程智能装备联合研发中心”。11月,中国核建总部迁址上海青浦,正式在沪办公;核动力院上海研究中心、中核集团“核创空间”长三角科技成果孵化中心和中核装备技术研究(上海)有限公司落户上海。

Translation via Google:

Top Ten Events of Shanghai Nuclear Power Industry in 2021

2022-03-09 09:20
Source: Shanghai Nuclear Power
[accidentally copied in extra stuff on that line]

A batch of key equipment for the fourth-generation reactor—2MWt liquid fuel thorium-based molten salt experimental reactor project was successfully delivered.

On March 23, the first batch of equipment for the full-reactor control system developed by [National Nuclear Corporation] was delivered to the project site in Wuwei, Gansu as scheduled; on May 19 and November 17, the metal reactor internals and Fuel salt drain tanks are delivered separately.

Captions on images:

9.新堆型装备研制取得新突破

9. New breakthroughs have been made in the development of new reactor equipment

四代堆—2MWt液态燃料钍基熔盐实验堆项目关键设备顺利交货

The fourth generation reactor—2MWt liquid fuel thorium-based molten salt experimental reactor project key equipment delivered smoothly

Red banner:

[SPIC] [SINAP] 祝贺中科院上海应物所2MWt液态燃料钍基熔盐实验堆全堆控制系统顺利发货

[SPIC] [SINAP] Congratulations on the successful delivery of the whole reactor control system for the 2MWt liquid fuel thorium-based molten salt experimental reactor of the Shanghai Institute of Applied Materials, Chinese Academy of Sciences

3月23日,国核自仪研制的全堆控制系统

On March 23, the full-reactor control system developed by the State Nuclear Power Technology Co., Ltd.

首批设备如期发往甘肃武威项目现场

The first batch of equipment was sent to the project site in Wuwei, Gansu as scheduled

On beam: 横臂下严禁站人!

Standing under the cross arm is strictly prohibited!

上海电气核电设备有限公司承制的金属堆内构件

Metal reactor internals manufactured by Shanghai Electric Nuclear Power Equipment Co., Ltd.

和燃料盐排放罐分别实现交付

and fuel salt drain tanks are delivered separately

Conrad Knauer (@[email protected]) on Twitter

“#Nuclear #Thorium #LFTR #China #钍 #TMSR "on May 19 and November 17, [2021] the metal reactor internals and Fuel salt drain tanks are delivered separately." https://t.co/96gmCCkw0G @gordonmcdowell @FissionLiquide @StephenABoydPh1 @OskaArcher @AchalHP @danielbrayhast”

Twitter