"By definition, creating innovative stuff demands doing things that haven’t been done before. So building an innovative product half way, then throwing it out and building it a second time to completion will not only take less time than building it once, but will result in a far better product, both from an engineering standpoint and from the user’s perspective."
Plan to Throw One Away. A story about Ruby.
#AlanCooper #FatherOfVisualBasic #notthatRuby
https://mralancooper.medium.com/plan-to-throw-one-away-df05fde7bf63