Projections from the #PhilippineEnergyPlan indicate that by 2030, #Visayas will require a power-generating capacity ranging from 4,423 to 4,495 megawatts to meet its needs. #PowerCrisis #Philippines

Visayas needs 10% increase in power capacity to stave off #blackouts
https://www.rappler.com/nation/visayas/visayas-needs-increase-power-capacity-stave-off-blackouts/

Visayas needs 10% increase in power capacity to stave off blackouts

Projections from the Philippine Energy Plan indicate that by 2030, Visayas will require a power-generating capacity ranging from 4,423 to 4,495 megawatts to meet its needs

RAPPLER