One day, there's faults. The next day, no faults! How does that happen? Why #CoverUps of course!

"Possible two active faults situated under the [#Shika / #Shiga] reactors

"On 16 July 2012 research done by the Japanese government revealed the strong possibility that the S-1-fault beneath the power station might be active, raising doubts about the claim made by the company in 1997 that it is inactive. It is not allowed to build a nuclear reactor above an active quake fault. If these findings would be confirmed, the Shika power station could be labeled as sitting on premises ineligible for a nuclear power plant. The fault, which runs southeast to northwest within the premises—moved sometime after 130,000 to 120,000 years ago.

"A review of old excavation data did suggest the strong possibility, that S-1 could have been active in a relatively recent period. Considering the presence of another fault that lies beneath the No. 2 reactor, should the two faults move at the same time, it could put the power plant into danger.

"A Nuclear Regulation Authority (NRA) draft report of March 2016 confirmed that the fault below unit 1 is likely to be active, and that two faults below unit 2 were possibly active.

"In 2023 however, the NRA finally agreed with Hokuriku Electric [#HEPCO] that no active faults exist under the plant. (!!!)

"In the 2024 Sea of Japan earthquake, it was reported that an explosion occurred on the site with a reactor being rendered inoperable after an oil spill."

https://en.wikipedia.org/wiki/Shika_Nuclear_Power_Plant

#HEPCOLies #TEPCOLies #JapanEarthquake2024 #SeaOfJapanEarthquake2024 #JapanEarthquake #ShigaNuclearPowerPlant #ShikaNuclearPlant #NuclearPowerCorruptionAndLies #NoNukes #RethinkNotRestart

Shika Nuclear Power Plant - Wikipedia

Apparently HEPCO, like #TEPCO, also practices lies and cover ups!

via @pandapanda

"In 1999, during a routine inspection of the #ShigaNuclearPowerPlant, three control rods pulled out and caused a criticality accident, but this was #CoveredUp, and it was discovered and made public eight years later by Hokuriku Electric Power's [#HEPCO] internal investigation. At that time, the Social Democratic Party (SDP) began investigating the #Shiga Nuclear Power Plant. Covering up even criticality accidents is a big problem.

"Politics and the nuclear village haven't changed. They may also cover up It was covered up at the time of 311."

https://kolektiva.social/@pandapanda@mstdn.jp/111681866327232329

#RethinkNotRestart #NoNukes #JapanEarthquake2024 #Shika #ShikaNuclearPlant #TEPCOLies #HEPCOLies