825 Followers
2 Following
8 Posts
Just two days left until the first hearing in Newag's lawsuit against us (Dragon Sector members) and SPS. It will take place on 28.08.2024 at 10:00. In case you've missed it, we're being accused of infringing upon Newag's intellectual property and unfair competition. This is, of course, bullshit and a great example of a SLAPP case.
First attempt at sabotaging our 37C3 talk - just got a paper model of an Impuls train right when we should be finishing our slides 😬
@redford 🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔🤔
Happy Train's Secondary Compressor Stops Working Day to all who celebrate it! 🤗

@redford and @mrtick held an unrecorded talk a bout this at OhMyHack in Warsaw - I unfortunately couldn't make it because of Munich snow.

For now this is making the rounds in Polish-speaking sources, but we do have a talk scheduled about this at 37C3, in which we plan to do a deep dive into this and actually publish our findings.

@zaufanatrzeciastrona 's article about this: https://zaufanatrzeciastrona.pl/post/o-trzech-takich-co-zhakowali-prawdziwy-pociag-a-nawet-30-pociagow/

O trzech takich, co zhakowali prawdziwy pociąg – a nawet 30 pociągów | Zaufana Trzecia Strona

Pociąg produkcji polskiej firmy nagle zepsuł się w trakcie serwisu. Fachowcy byli bezradni - pociąg był w porządku, tylko nie chciał jechać. W ostatnim odruchu…

Zaufana Trzecia Strona

The key unlock was deleted in newer PLC software versions, but the lock logic remained.

After a certain update by NEWAG, the cabin controls would also display scary messages about copyright violations if the HMI detected a subset of conditions that should've engaged the lock but the train was still operational.

The trains also had a GSM telemetry unit that was broadcasting lock conditions, and in some cases appeared to be able to lock the train remotely.

3/4

We found that the PLC code actually contained logic that would lock up the train with bogus error codes after some date, or if the train wasn't running for a given time. One version of the controller actually contained GPS coordinates to contain the behaviour to third party workshops.

It was also possible to unlock the trains by pressing a key combination in the cabin controls. None of this was documented.

2/4

I can finally reveal some research I've been involved with over the past year or so.

We (@redford, @mrtick and I) have reverse engineered the PLC code of NEWAG Impuls EMUs. These trains were locking up for arbitrary reasons after being serviced at third-party workshops. The manufacturer argued that this was because of malpractice by these workshops, and that they should be serviced by them instead of third parties.

1/4