@smveerman Yes, but going back to the original point: they can't handle the elevators. So keep the incline as a backup, or construct a better incline. (If they keep up a SLA of 99,9 on all elevators for an extended period of time then maybe they can have a chance of having that as a primary option. We failed that as society.)