All lanes in the Posey Tube—including the pedestrian and bike path—will be closed for construction from 11 p.m. to 5 a.m. through Friday, March 6. https://alamedapost.com/news/posey-tube-fully-closed-overnight-march-6/

#alameda #caltrans #PoseyTube

Posey Tube to be Fully Closed Overnight Through March 6 - Alameda Post

All lanes in the Posey Tube—including the pedestrian and bike path—will be closed for construction from 11 p.m. to 5 a.m. through March 6.

Alameda Post