future 168 stalls,
now: 11 MW of solar, 10 Megapack πππ
8 months construction time;
π Lost Hills, CA πΊπΈ
84 stalls now open: solely powered by the sun and operating off-grid (!) πππ
#battchat #alwaysbecharging
Enough juice to charge 1,000 cars a day off solar assuming 7.5 solar hours/ day and 82kWh
