🤔
Cost of Ontario Science Centre temporary location exceeds cost of roof repairs
https://www.canadianarchitect.com/cost-of-ontario-science-centre-temporary-location-exceeds-cost-of-roof-repairs/
Cost of Ontario Science Centre temporary location exceeds cost of roof repairs
The time required to set up a temporary location will mean that there is no Science Centre location for two years; the RFP also reveals that a new Science Centre at Ontario Place would not be ready until 2030-2034.