Design finalized for the Route 40 Transit-Plus Multimodal Corridor, construction to begin in 2024

Cross posted from SDOT Blog With input from the community, the final design on the Route 40 Transit-Plus Multimodal Corridor project has been completed and construction is set to begin in 2024. Met…

Metro Matters