Two segments of the waterfront trail (Shoreline Park) that lead up to the Bay Farm Island bike bridge will be closed back-to-back August 15 to September 8 for widening and repaving. Please use extra caution while traveling through the area.

https://alamedapost.com/news/waterfront-trail-repaving-closures/

#alameda #BayFarmIsland #BikeWalkAlameda #CityOfAlameda #ebmud #SeeClickFix #ShorelinePark #TrailClosure #WaterfrontTrail

Waterfront Trail Repaving Closures - Alameda Post

Segments of the waterfront trail that lead to the Bay Farm Island bike bridge will be closed starting August 15 for repaving.

Alameda Post