I've had the NSF feed on my TV the entire nine days. I used to watch Shuttle missions launch to landing to have the chatter in the background.
Bring on #ArtemisIV already!

So SLS planning only goes as far as Artemis V?
After that, there's nothing.
Is the program to accelerate Artemis only meant to get Trump his moon landing as quickly as possible, and just a fancy way to wrap up the SLS shutdown?
The timeline still seems completely unrealistic to me.
Poor NASA. Why are they doing this? So sad. Year after year goes by, and the braggarts have the upper hand.
#Artemis #ArtemisIV #ArtemisV #Mondlandung #NASA #SLS #Rakete #Raumfahrt #rocketry #SpaceFlight
#talkoftitusville:
"
NASA Formally Selects ULA’s Centaur V For Artemis IV and V
"
".. deliver two flight units and one flight spare, with the first stage required at Kennedy Space Center no later than nine months prior to the Artemis IV launch, currently targeted for early 2028, and the second no later than L-9 months ahead of Artemis V, planned for late 2028. .."
https://talkoftitusville.com/2026/03/06/nasa-formally-selects-ulas-centaur-v-for-artemis-iv-and-v/
6.3.2025
#Artemis #ArtemisIV #ArtemisV #Mondlandung #NASA #SLS #Rakete #Raumfahrt #rocketry #SpaceFlight
starlust.org:
"
Here's what NASA is planning for Artemis IV and V now that the roadmap to the Moon has been revised
"
"Artemis IV and V will see astronauts return to the surface of the Moon while Artemis III will essentially be another test flight."
4.3.2026
We will see.
#Artemis #ArtemisIII #ArtemisIV #ArtemmisV #BO #Mond #Mondlandung #moon #NASA #Raumfahrt #SpaceFlight #SpaceX
#NASA:
"
NASA Adds Mission to Artemis Lunar Program, Updates Architecture
"
".. Artemis III mission, now in 2027, will be designed to test out systems and operational capabilities in low Earth orbit to prepare for an Artemis IV landing in 2028."
"..want to fly the landing missions in as close to the same Earth ascent configuration as possible .. as close to the ‘Block 1’.."
https://www.nasa.gov/news-release/nasa-adds-mission-to-artemis-lunar-program-updates-architecture/
27.2.2026
#Artemis #ArtemisIII #ArtemisIV #Mond #moon #Mondlandung #Raumfahrt #SpaceFlight #USA
A water system activation at the Thad Cochran Test Stand (B-2) on Jan. 30 at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, helped capture critical data to support testing a new SLS (Space Launch System) stage expected to fly on the Artemis IV mission.